Implementation plan

Implementation plan

1. Engineering requirements
1. The demand side should ensure that the highest of the two points has the right to use;

2. An equipment room where equipment can be placed should be provided at the installation site, and 220V AC power should be provided;

3. According to the needs of installing antennas and equipment, antenna poles should be provided at each point;

4. The use of the product should strictly follow the operating instructions.

Second, the implementation steps
Sunet is responsible for providing central base station equipment, remote station equipment and other accessories; branches of the operator are responsible for applying to the local radio administration for 5.8GHz band approval, selecting base station locations and service areas, and providing related infrastructure and conditions. Engineers and technicians are sent by Sunet to complete the system integration work such as equipment installation and commissioning.

1. Process of project implementation

Figure: SWR5800 project implementation flowchart

2. Stages of project implementation

Implementation phase table

Serial number

Work item name

main content

1

System design

Complete data preparation; refine equipment configuration and performance index requirements; complete personnel arrangements, material preparation, schedule planning and other engineering-related work for the implementation of the project.

2

Business negotiation

The project participants conduct business negotiations and sign contracts.

3

Site environment preparation

The preparation of related site infrastructure and basic conditions creates conditions for the installation of equipment on site.

4

Equipment preparation

The preparation, inspection and assembly of the complete set of equipment for the central base station and remote station as stipulated in the contract, and the equipment enters the site.

5

Project implementation

Equipment installation.

6

Customer training

Conduct on-site and centralized training for customer operation and maintenance personnel, the training content includes all aspects of system operation and operation management.

7

Network test, trial operation

Pilot operation, conduct network test, and check relevant performance indicators. The test results should be consistent with the program design and contract specifications, and corrective measures should be taken if necessary.

8

System acceptance

If the system operation meets the standards stipulated in the contract, it will pass the customer's acceptance.