Implementation plan
1. Engineering requirements
1. The demand side should ensure that the highest of the two points has the right to use;
2. An equipment room where equipment can be placed should be provided at the installation site, and 220V AC power should be provided;
3. According to the needs of installing antennas and equipment, antenna poles should be provided at each point;
4. The use of the product should strictly follow the operating instructions.
Second, the implementation steps
Sunet is responsible for providing central base station equipment, remote station equipment and other accessories; branches of the operator are responsible for applying to the local radio administration for 5.8GHz band approval, selecting base station locations and service areas, and providing related infrastructure and conditions. Engineers and technicians are sent by Sunet to complete the system integration work such as equipment installation and commissioning.
1. Process of project implementation |
|
Figure: SWR5800 project implementation flowchart |
2. Stages of project implementation |
Implementation phase table |
| Work item name | main content | | System design | Complete data preparation; refine equipment configuration and performance index requirements; complete personnel arrangements, material preparation, schedule planning and other engineering-related work for the implementation of the project. | | Business negotiation | The project participants conduct business negotiations and sign contracts. | | Site environment preparation | The preparation of related site infrastructure and basic conditions creates conditions for the installation of equipment on site. | | Equipment preparation | The preparation, inspection and assembly of the complete set of equipment for the central base station and remote station as stipulated in the contract, and the equipment enters the site. | | Project implementation | Equipment installation. | | Customer training | Conduct on-site and centralized training for customer operation and maintenance personnel, the training content includes all aspects of system operation and operation management. | | Network test, trial operation | Pilot operation, conduct network test, and check relevant performance indicators. The test results should be consistent with the program design and contract specifications, and corrective measures should be taken if necessary. | | System acceptance | If the system operation meets the standards stipulated in the contract, it will pass the customer's acceptance. |
|
R18 Bone Conduction Headset
R18 Bone Conduction Headset,Waterproof Wireless Headphones,Wireless Sports Earphones Headphone,R18 Sport Headset
Shenzhen Lonfine Innovation Technology Co., Ltd , https://www.lonfinesmart.com